EMC risk management can mean different things for a variety of EMC engineers. For some, it means reducing design risks for standard compliance, and for others, it means a risk-based approach to ensure EMC. In its extreme end, the risk-based approach can be used to ensure dependability of electric and electronic systems under electromagnetic disturbances (EMD). This is called EM resilience. In this session, different aspects and advances in EMC risk management are discussed.
In this year’s revision, Mr. Tishehzan discussed a topic on argumenting EM resilience of a system. Then, Dr. Gavrilakis discussed a practical implementation of a risk-based EMC approach in railway systems, and finally Mr. Leppäaho talked about the EMC problematic of large high power drive systems and how to apply risk-based approach there.